What have you contributed to this week?
In this week we had a deadline for our music video, although it wasn’t a deadline for the final music video, but we needed to have something that looked good and ran by what we were aiming to create. We meet the deadline, and from strict criticism we were happy with our performance. With one or two things that could have been done better we are happy with what we done.
How does this fit in with the production schedule/job roles/overall ideas for the project?
With some other groups within our class, they are slightly behind, and may find it hard to meet the deadline, and with an extension we can focus on the filming that needed to be corrected and spend more time on the editing, this doesn’t really effect the production schedule, it just means that our final date can be extended until mid-week next week.
Where there any problems?
As I said before from the criticism that we received, we only faced one issue which was the filming, and luckily it was within the area so we didn’t have to face any difficulties so we managed, to film and fix that issue.
What are the plans for the following week?
For the following week me just want to fix up on the small errors, and give the music video a final polish with the editing to make sure everything was fine and looked good from the human eye, we have planned to meet the deadline before the actual day, and with TJ having the editing software we can do this after editing time and get things done to the best extent and as fast as possible.